<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Marafi Al Tamyeez General Contracting</title>
    <link>https://marafi330.com/en/blog/</link>
    <atom:link href="https://marafi330.com/en/feed.xml" rel="self" type="application/rss+xml"/>
    <description>Practical building, finishing and renovation guides for Riyadh</description>
    <language>en</language>
    <lastBuildDate>Wed, 11 Nov 2026 17:02:38 GMT</lastBuildDate>
    <item>
      <title>Villa Construction Stages in Riyadh, Step by Step to Handover</title>
      <link>https://marafi330.com/en/blog/villa-construction-stages-riyadh/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/villa-construction-stages-riyadh/</guid>
      <pubDate>Mon, 02 Nov 2026 05:00:00 GMT</pubDate>
      <description>A practical guide to the stages of building a villa in Riyadh: permits, foundations, structure, blockwork, plaster, finishing and handover, and what to inspect.</description>
      <enclosure url="https://marafi330.com/assets/img/villa-skeleton-crane.jpg" type="image/jpeg" length="167999"/>
    </item>
    <item>
      <title>Skeleton vs Turnkey Contract: Which Suits Your Riyadh Villa?</title>
      <link>https://marafi330.com/en/blog/skeleton-vs-turnkey/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/skeleton-vs-turnkey/</guid>
      <pubDate>Fri, 30 Oct 2026 05:00:00 GMT</pubDate>
      <description>Skeleton-only or full turnkey? What each villa construction contract in Riyadh covers, who carries responsibility, and how to choose for your time and budget.</description>
      <enclosure url="https://marafi330.com/assets/img/column-rebar-in-formwork.jpg" type="image/jpeg" length="113040"/>
    </item>
    <item>
      <title>How to Choose a Licensed Contractor in Riyadh: What to Verify</title>
      <link>https://marafi330.com/en/blog/choosing-licensed-contractor-riyadh/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/choosing-licensed-contractor-riyadh/</guid>
      <pubDate>Wed, 28 Oct 2026 05:00:00 GMT</pubDate>
      <description>How to vet a building contractor in Riyadh before you sign: Saudi Contractors Authority membership on Muqawil, chamber membership, VAT and a written contract.</description>
      <enclosure url="https://marafi330.com/assets/img/engineers-inspecting-wall.jpg" type="image/jpeg" length="280215"/>
    </item>
    <item>
      <title>Foundation Types in Riyadh and Why the Soil Report Decides</title>
      <link>https://marafi330.com/en/blog/foundation-types-riyadh-soil/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/foundation-types-riyadh-soil/</guid>
      <pubDate>Mon, 26 Oct 2026 05:00:00 GMT</pubDate>
      <description>Isolated, combined, strip or raft foundations: how each works, when engineers use it in Riyadh, why the soil report decides, and what to check before pouring.</description>
      <enclosure url="https://marafi330.com/assets/img/raft-foundation-rebar.jpg" type="image/jpeg" length="230861"/>
    </item>
    <item>
      <title>Termite Treatment Before Foundations: Why It Comes First</title>
      <link>https://marafi330.com/en/blog/termite-treatment-before-foundations/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/termite-treatment-before-foundations/</guid>
      <pubDate>Sat, 24 Oct 2026 05:00:00 GMT</pubDate>
      <description>Why soil is treated for termites before foundations are poured in Riyadh: when and where it is sprayed, which products to expect, and mistakes that weaken it.</description>
      <enclosure url="https://marafi330.com/assets/img/blinding-concrete-pour.jpg" type="image/jpeg" length="255787"/>
    </item>
    <item>
      <title>Polyethylene Moisture Barrier and Blinding Concrete Explained</title>
      <link>https://marafi330.com/en/blog/moisture-barrier-blinding-concrete/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/moisture-barrier-blinding-concrete/</guid>
      <pubDate>Wed, 21 Oct 2026 05:00:00 GMT</pubDate>
      <description>Why a polyethylene sheet goes under the foundations, followed by blinding concrete: what each layer does, how to lay them well and what to check before rebar.</description>
      <enclosure url="https://marafi330.com/assets/img/raft-waterproofing-membrane.jpg" type="image/jpeg" length="195134"/>
    </item>
    <item>
      <title>Column Formwork Quality: Keeping Concrete Columns Plumb</title>
      <link>https://marafi330.com/en/blog/column-formwork-quality/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/column-formwork-quality/</guid>
      <pubDate>Mon, 19 Oct 2026 05:00:00 GMT</pubDate>
      <description>How column formwork should be fixed, braced and checked for plumb before and after the pour, plus the common defects Riyadh owners should spot early on site.</description>
      <enclosure url="https://marafi330.com/assets/img/column-formwork-plumb-check.jpg" type="image/jpeg" length="219948"/>
    </item>
    <item>
      <title>Pouring and Curing Concrete in Riyadh Heat: A Practical Guide</title>
      <link>https://marafi330.com/en/blog/concrete-pouring-curing-hot-weather/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/concrete-pouring-curing-hot-weather/</guid>
      <pubDate>Fri, 16 Oct 2026 05:00:00 GMT</pubDate>
      <description>How to pour concrete in a Riyadh summer without cracks or lost strength: pour timing, cooling the mix, vibration and finishing, and curing in the first days.</description>
      <enclosure url="https://marafi330.com/assets/img/concrete-pump-boom.jpg" type="image/jpeg" length="179737"/>
    </item>
    <item>
      <title>Hollow-Block (Hourdi) vs Solid Slabs: Which Suits Your Villa?</title>
      <link>https://marafi330.com/en/blog/hollow-block-slab-vs-solid/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/hollow-block-slab-vs-solid/</guid>
      <pubDate>Wed, 14 Oct 2026 05:00:00 GMT</pubDate>
      <description>Hourdi slabs with concrete block or EPS versus solid slabs compared: weight, insulation, spans, services and relative cost, and when each suits a Riyadh villa.</description>
      <enclosure url="https://marafi330.com/assets/img/hollow-block-slab-rebar.jpg" type="image/jpeg" length="315352"/>
    </item>
    <item>
      <title>Block Types in Saudi Arabia: Concrete, Insulated and Red Block</title>
      <link>https://marafi330.com/en/blog/block-types-saudi/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/block-types-saudi/</guid>
      <pubDate>Mon, 12 Oct 2026 05:00:00 GMT</pubDate>
      <description>Concrete hollow and solid block, insulated block and red clay block compared: where each suits a Riyadh villa, relative cost level, and what to check on site.</description>
      <enclosure url="https://marafi330.com/assets/img/villa-blockwork-walls.jpg" type="image/jpeg" length="206081"/>
    </item>
    <item>
      <title>Plastering Quality Checklist Before Finishing: An Owner's Guide</title>
      <link>https://marafi330.com/en/blog/plastering-quality-checklist/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/plastering-quality-checklist/</guid>
      <pubDate>Fri, 09 Oct 2026 05:00:00 GMT</pubDate>
      <description>A practical checklist for inspecting plaster before paint and tiles: flatness, plumb, corners, hollow spots, cracks and curing, so defects don't show up later.</description>
      <enclosure url="https://marafi330.com/assets/img/concrete-blockwork-wall.jpg" type="image/jpeg" length="185095"/>
    </item>
    <item>
      <title>Exterior Profile Paint in Riyadh: Textures and How It Is Applied</title>
      <link>https://marafi330.com/en/blog/exterior-paint-profile-finishes/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/exterior-paint-profile-finishes/</guid>
      <pubDate>Wed, 07 Oct 2026 05:00:00 GMT</pubDate>
      <description>Smooth, textured and stone-effect exterior finishes for Riyadh villas: preparing plaster, the right coat sequence, and finishes that handle sun and dust.</description>
      <enclosure url="https://marafi330.com/assets/img/exterior-paint-scaffold.jpg" type="image/jpeg" length="140859"/>
    </item>
    <item>
      <title>Building Permit Steps in Saudi Arabia via Balady: An Overview</title>
      <link>https://marafi330.com/en/blog/building-permit-saudi-steps/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/building-permit-saudi-steps/</guid>
      <pubDate>Mon, 05 Oct 2026 05:00:00 GMT</pubDate>
      <description>A general guide to getting a building permit through Balady: documents, the role of the engineering office and contractor, and what follows once it is issued.</description>
      <enclosure url="https://marafi330.com/assets/img/aerial-earthworks.jpg" type="image/jpeg" length="195356"/>
    </item>
    <item>
      <title>Villa Facade Ideas for Riyadh: Designs That Handle Sun and Dust</title>
      <link>https://marafi330.com/en/blog/villa-facade-ideas-riyadh/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/villa-facade-ideas-riyadh/</guid>
      <pubDate>Fri, 02 Oct 2026 05:00:00 GMT</pubDate>
      <description>Practical villa facade ideas for Riyadh: profile paint, stone cladding, shading, screens and colours that cope with sun and dust, plus details that stay clean.</description>
      <enclosure url="https://marafi330.com/assets/img/building-scaffolding.jpg" type="image/jpeg" length="152734"/>
    </item>
    <item>
      <title>Floor Levelling and Tiling Mistakes in Riyadh: How to Avoid Them</title>
      <link>https://marafi330.com/en/blog/floor-tiling-leveling-mistakes/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/floor-tiling-leveling-mistakes/</guid>
      <pubDate>Wed, 30 Sep 2026 05:00:00 GMT</pubDate>
      <description>The most common floor levelling and tiling mistakes in Riyadh homes: uneven screed, hollow tiles, missing joints and wrong falls, and how to check for them.</description>
      <enclosure url="https://marafi330.com/assets/img/tile-leveling-clips.jpg" type="image/jpeg" length="93287"/>
    </item>
    <item>
      <title>Why Construction Site Supervision Matters for Your Villa Build</title>
      <link>https://marafi330.com/en/blog/construction-site-supervision-importance/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/construction-site-supervision-importance/</guid>
      <pubDate>Mon, 28 Sep 2026 05:00:00 GMT</pubDate>
      <description>Why engineering supervision on a Riyadh building site matters, especially for the structure: inspection points before every pour, records, safety, owner checks.</description>
      <enclosure url="https://marafi330.com/assets/img/beam-rebar-cage.jpg" type="image/jpeg" length="192174"/>
    </item>
    <item>
      <title>Aluminium Kitchens in Riyadh: Pros, Cons and How to Care for Them</title>
      <link>https://marafi330.com/en/blog/aluminum-kitchens-guide/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/aluminum-kitchens-guide/</guid>
      <pubDate>Sat, 26 Sep 2026 05:00:00 GMT</pubDate>
      <description>Aluminium kitchens in Riyadh: why they resist moisture and termites, their drawbacks, how they compare with wood and MDF on relative cost, and care tips.</description>
      <enclosure url="https://marafi330.com/assets/img/aluminum-kitchen.jpg" type="image/jpeg" length="30539"/>
    </item>
    <item>
      <title>Underground Water Tank Construction in Riyadh, Done Properly</title>
      <link>https://marafi330.com/en/blog/underground-water-tank-construction/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/underground-water-tank-construction/</guid>
      <pubDate>Thu, 24 Sep 2026 05:00:00 GMT</pubDate>
      <description>How to build a concrete underground water tank in Riyadh: location, reinforcement and pour, waterstops, inside and outside waterproofing, and a fill test first.</description>
      <enclosure url="https://marafi330.com/assets/img/underground-tank-walls.jpg" type="image/jpeg" length="356020"/>
    </item>
    <item>
      <title>Old Villa Renovation in Riyadh: Assess, Keep, Replace, Phase</title>
      <link>https://marafi330.com/en/blog/old-villa-renovation-riyadh/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/old-villa-renovation-riyadh/</guid>
      <pubDate>Tue, 22 Sep 2026 05:00:00 GMT</pubDate>
      <description>Renovating an older villa in Riyadh? How to assess the structure, damp and services, decide what to keep or replace, and phase the work so nothing gets redone.</description>
      <enclosure url="https://marafi330.com/assets/img/bedroom-after.jpg" type="image/jpeg" length="103316"/>
    </item>
    <item>
      <title>Interior Finishing Handover Checklist for Riyadh Villas</title>
      <link>https://marafi330.com/en/blog/interior-finishing-checklist/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/interior-finishing-checklist/</guid>
      <pubDate>Sun, 20 Sep 2026 05:00:00 GMT</pubDate>
      <description>A room-by-room interior finishing checklist for villa and apartment handover in Riyadh: paint, gypsum, tiles, doors, power, plumbing, kitchen and bathrooms.</description>
      <enclosure url="https://marafi330.com/assets/img/finished-room-blinds.jpg" type="image/jpeg" length="80961"/>
    </item>
    <item>
      <title>Staircase Renovation: Marble vs Porcelain vs Granite Compared</title>
      <link>https://marafi330.com/en/blog/staircase-marble-renovation/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/staircase-marble-renovation/</guid>
      <pubDate>Fri, 18 Sep 2026 05:00:00 GMT</pubDate>
      <description>Marble, porcelain or granite for your stairs? Compare durability, slip resistance, upkeep and relative cost, and learn how to renovate a staircase properly.</description>
      <enclosure url="https://marafi330.com/assets/img/staircase-after.jpg" type="image/jpeg" length="86180"/>
    </item>
    <item>
      <title>Commercial Building Construction in Riyadh: Planning to Handover</title>
      <link>https://marafi330.com/en/blog/commercial-building-construction-riyadh/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/commercial-building-construction-riyadh/</guid>
      <pubDate>Thu, 17 Sep 2026 05:00:00 GMT</pubDate>
      <description>A guide to commercial building construction in Riyadh: planning and permits, basements and retaining walls, pour sequencing, site safety and the consultant.</description>
      <enclosure url="https://marafi330.com/assets/img/tiered-slab-crew.jpg" type="image/jpeg" length="158082"/>
    </item>
    <item>
      <title>Construction Cost in Riyadh: What Really Decides the Price?</title>
      <link>https://marafi330.com/en/blog/construction-cost-factors-riyadh/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/construction-cost-factors-riyadh/</guid>
      <pubDate>Mon, 14 Sep 2026 05:00:00 GMT</pubDate>
      <description>What decides the cost of building a villa in Riyadh? The real cost factors, from soil and design to finishing level, and how to compare contractor quotations.</description>
      <enclosure url="https://marafi330.com/assets/img/aerial-site-overview.jpg" type="image/jpeg" length="200839"/>
    </item>
    <item>
      <title>Boundary Wall Construction in Riyadh: Footings to Gates Guide</title>
      <link>https://marafi330.com/en/blog/boundary-wall-construction/</link>
      <guid isPermaLink="true">https://marafi330.com/en/blog/boundary-wall-construction/</guid>
      <pubDate>Thu, 10 Sep 2026 05:00:00 GMT</pubDate>
      <description>How to build a boundary wall that stays straight and sound: footings, ground beams, columns, blockwork, finishes and gates, and what to check at every stage.</description>
      <enclosure url="https://marafi330.com/assets/img/perimeter-retaining-wall.jpg" type="image/jpeg" length="207120"/>
    </item>
  </channel>
</rss>
