Villa construction stages in Riyadh: what happens at each stage and what to check
From termite treatment and blinding concrete to handing over the keys: the stages of building a villa in Riyadh and what to verify before each one is covered.
General contracting · Riyadh
Marafi Al Tamyeez General Contracting builds villas and commercial buildings from foundations to finishing, with engineering precision and respect for drawings, schedules and safety.

Real photos from our sitesEvery photo on this site shows work by the Marafi team
01Services
Fourteen services covering the whole project cycle, contracted together or separately.



02How we build
We never shortcut the hidden stages. Each one is inspected before the next covers it.
Before anything else, the soil is treated against termites with approved products; treating them after construction is hard and costly.
A polyethylene sheet is laid carefully with generous overlaps to stop ground moisture rising into the concrete.
A layer of plain concrete gives a clean, level base for footing steel and keeps soil away from the reinforcement.
Formwork and rebar for footings, ground beams and necks, set out precisely, then poured and coated with bitumen below ground.
Column formwork is fixed and checked for plumb before and after each pour so every column stands true.
03Why Marafi
We build exactly what the approved drawing shows and check with the engineer before, not after.
Labourers, technicians, supervisors and engineers, each in their role, with modern pouring and formwork equipment.
PPE, secured excavations and safe scaffolding are part of how we work every day.
An itemised proposal by stage, with what each item covers spelled out so there are no surprises.

04Before & after


A damaged, bare concrete staircase clad in marble with skirting and a timber handrail.


A room with a soil floor and exposed services became a refined space with new flooring, concealed lighting and a high-quality finish.

05Marafi
Marafi specialises in general contracting of every kind. We deliver complete solutions that combine quality, accuracy and commitment to specifications and deadlines: residential villas and commercial buildings, reinforced concrete, interior and exterior finishing, infrastructure, boundary walls and tanks, and structural works.
About us06Blog
From termite treatment and blinding concrete to handing over the keys: the stages of building a villa in Riyadh and what to verify before each one is covered.
A clear comparison of contracting the structural shell only versus a full turnkey villa: scope, your role as owner, common mistakes and when each option fits.
Before you hand your plot to a contractor: how to verify Saudi Contractors Authority membership, chamber and VAT registration, and what a written contract should include.
Frequently asked questions
We are based in Al Aqeeq, Riyadh, and work across Riyadh’s districts. For projects outside Riyadh, contact us to discuss.
Yes. Marafi Al Tamyeez General Contracting is registered with the Saudi Contractors Authority (membership 2119211993), is a Riyadh Chamber member and is VAT registered; the numbers can be checked on the official sites.
No. Cost depends on drawings, area and specification, so we visit the site, review the drawings and send an itemised proposal.
Send us the project type, location and current stage on WhatsApp and we will arrange a site visit and review the drawings with you.
Start your project
Tell us the project type and location. A Marafi engineer will arrange a site visit, review your drawings and send a detailed proposal.
Contact us
Choose the easiest way to reach us and we will get back to you soon.
Follow us