Villa construction stages in Riyadh: what happens at each stage and what to check
From termite treatment and blinding concrete to handing over the keys: the stages of building a villa in Riyadh and what to verify before each one is covered.

Services
We build your villa from excavation and foundations through the structure and finishing, with engineering supervision throughout.
A villa is a decision you live with for decades, so we treat it as one engineered project rather than a string of separate trades. We start by reading the approved drawings and preparing the site, then build the foundations, the concrete frame, blockwork and plaster, through to interior and exterior finishing, with an engineer checking every stage until you receive a villa with nothing left to fix.
Villa Construction
Frequently asked questions
Both. You can contract us for the structural skeleton only or for full construction through finishing, and the proposal spells out exactly what each item covers.
We do not start construction before the permit and approved drawings are in place, but we can visit the plot and review drawings early so the proposal and schedule are ready.
We send photo updates at every key stage, foundations, columns, slabs, blockwork and plaster, and you can visit the site at any time by arrangement with the site supervisor.
Area, number of floors, foundation and slab type and the finishing level. After the visit and drawing review we give an itemised proposal rather than a generic estimate.
From termite treatment and blinding concrete to handing over the keys: the stages of building a villa in Riyadh and what to verify before each one is covered.
A clear comparison of contracting the structural shell only versus a full turnkey villa: scope, your role as owner, common mistakes and when each option fits.
Before you hand your plot to a contractor: how to verify Saudi Contractors Authority membership, chamber and VAT registration, and what a written contract should include.
Solid foundations that start with termite treatment, a moisture barrier and blinding concrete, then footings and ground beams.
Learn more 03A precise concrete frame: plumb columns, reinforced slabs and stairs, built strictly to the structural drawings.
Learn more 08Gypsum ceilings and lighting, floors, paint, doors and bathrooms, with detail that reflects your taste.
Learn moreStart your project
Tell us the project type and location. A Marafi engineer will arrange a site visit, review your drawings and send a detailed proposal.
Contact us
Choose the easiest way to reach us and we will get back to you soon.
Follow us