Interior finishing handover checklist: an owner's guide, room by room
Before you sign the handover, walk your home with this list: what to check in each room, which tools to bring, and how to write snags so they actually get fixed.

Services
Gypsum ceilings and lighting, floors, paint, doors and bathrooms, with detail that reflects your taste.
We deliver modern interior finishing that balances elegance and function. Small details make the big difference, so we create refined interiors that reflect our clients’ taste and meet high standards of quality in every corner of the project.
Interior Finishing
Frequently asked questions
Yes. We suggest options to suit the use, budget and taste, and show samples before approval.
Services first, then ceilings, filler and a first paint coat, then floors, and finally fittings and the last coat so finished work is not damaged.
Yes, we finish whole villas, single floors, apartments or offices.
Before you sign the handover, walk your home with this list: what to check in each room, which tools to bring, and how to write snags so they actually get fixed.
Accurate floor levelling that prepares for flat tiling with no hollows and no lipping between tiles.
Learn more 11Modern aluminium kitchens built to a high standard, practical and resistant to moisture and heat.
Learn more 12We turn old spaces into modern ones with long-lasting rehabilitation.
Learn moreStart your project
Tell us the project type and location. A Marafi engineer will arrange a site visit, review your drawings and send a detailed proposal.
Contact us
Choose the easiest way to reach us and we will get back to you soon.
Follow us