MarafiAl Tamyeez Contracting
Blockwork and masonry

Services

Blockwork and masonry

Block walls of every type, laid true and plumb under engineering supervision.

We turn designs into finished reality, starting with the core structure and blockwork of every type and shape, built to a high standard and supervised by engineers. A straight, tightly laid wall saves plaster and reduces cracking later.

What’s included

  • Solid and hollow concrete block
  • Thermally insulated block for external walls
  • Red block where specified
  • Lintels over openings and wall-to-column ties
  • Level and plumb checks on every course
  • Openings left for services per drawings

Blockwork & Masonry

How we deliver it

  1. 01

    Set out walls and openings

  2. 02

    Lay level, plumb courses

  3. 03

    Lintels and ties to the frame

  4. 04

    Inspection before plastering

From our sites

Frequently asked questions

Blockwork & Masonry

Which block is best for external walls in Riyadh?

Insulated block is preferred outside to reduce heat gain, while standard concrete block usually suits internal walls. We follow what the drawings specify.

Why do cracks appear between walls and columns?

Usually from weak ties or different movement of the two materials. We use proper ties and plaster mesh at joints to reduce this.

Can I hire you for blockwork only?

Yes, blockwork can be contracted separately if the concrete frame is already built and in good order.

Read before you start

Start your project

Have a project in mind?

Tell us the project type and location. A Marafi engineer will arrange a site visit, review your drawings and send a detailed proposal.

Call now WhatsApp