MarafiAl Tamyeez Contracting
Commercial building construction in Riyadh

Services

Commercial building construction in Riyadh

Commercial and office buildings with robust concrete structures, organised site management and strict safety.

Commercial buildings need a contractor who knows every day of delay costs money and that the structure decides how long the building lasts. At Marafi we plan the site before the first pour: work sequence, steel and concrete supply, pumping equipment and crew allocation. Safety rules apply to everyone on site, so we can hand over a sound building on the agreed date.

What’s included

  • Excavation, foundations, rafts and retaining walls
  • Concrete frames for basements and typical floors
  • Coordination of supply, concrete pumps and cranes
  • Blockwork, plaster and facades
  • Site management and occupational safety
  • Regular progress reports for the owner and consultant

Commercial Buildings

How we deliver it

  1. 01

    Drawing review, scheduling and pour sequencing

  2. 02

    Site set-up, equipment and safety plan

  3. 03

    Structure and architectural works in inspected stages

  4. 04

    Handover coordinated with the consultant

From our sites

Frequently asked questions

Commercial Buildings

Do you work with a supervising consultant?

Yes. We coordinate with the consultant for the handover of each stage and follow their remarks and approvals before moving on.

How do you handle safety on large sites?

Crews wear full PPE, excavations and scaffolds are secured and equipment movement is controlled on site, as our project photos show.

Do you build basements and retaining walls?

Yes. We have built deep basements and tall retaining walls with steel formwork, dense reinforcement and organised pours.

Read before you start

Start your project

Have a project in mind?

Tell us the project type and location. A Marafi engineer will arrange a site visit, review your drawings and send a detailed proposal.

Call now WhatsApp