Quality construction starts with small details

How we build

Quality construction starts with small details

Twelve stages, always in order, each one inspected before the next covers it. That is how we guarantee what you cannot see after finishing.

  1. 01

    Termite treatment

    Before anything else, the soil is treated against termites with approved products; treating them after construction is hard and costly.

  2. 02

    Moisture barrier

    A polyethylene sheet is laid carefully with generous overlaps to stop ground moisture rising into the concrete.

    Moisture barrier
  3. 03

    Blinding concrete

    A layer of plain concrete gives a clean, level base for footing steel and keeps soil away from the reinforcement.

    Blinding concrete
  4. 04

    Footings and foundations

    Formwork and rebar for footings, ground beams and necks, set out precisely, then poured and coated with bitumen below ground.

    Footings and foundations
  5. 05

    Columns and plumb checks

    Column formwork is fixed and checked for plumb before and after each pour so every column stands true.

    Columns and plumb checks
  6. 06

    Slabs

    Hollow-block slabs with block or polystyrene, or solid slabs as drawn, with rebar and services inspected before every pour.

    Slabs
  7. 07

    Blockwork

    Walls go up in level, plumb courses, with lintels over openings and ties into the frame.

    Blockwork
  8. 08

    Plaster

    Internal and external plaster with true screeds, corner beads and mesh at joints for level, finish-ready walls.

    Plaster
  9. 09

    Exterior paint and profile

    The facade is prepared and finished in profile paint, in a texture and colour that suit you and stand up to Riyadh sun and dust.

    Exterior paint and profile
  10. 10

    Levelling and tiling

    Accurate floor levelling, then tiling with levelling clips and correct falls in wet areas.

    Levelling and tiling
  11. 11

    Interior finishing

    Gypsum ceilings, lighting, paint, doors and bathrooms, with care in every corner.

    Interior finishing
  12. 12

    Inspection and handover

    We walk the building with you room by room and close out every remark before handing it over.

Why insist on the order? A mistake in a hidden stage, such as the moisture barrier or a column out of plumb, is hard to fix once covered. So we inspect each stage and photograph it before moving on.

Explore our services

Start your project

Have a plot or a building that needs to be built right?

Tell us the project type and location. A Marafi engineer will arrange a site visit, review your drawings and send a detailed proposal.