MarafiAl Tamyeez Contracting
Marafi Al Tamyeez General Contracting

About us

Marafi Al Tamyeez General Contracting

A Saudi general contracting establishment in Riyadh. Excellence is the foundation of every project.

Excellence is the foundation of every project

Specialists in general contracting of every kind

Marafi specialises in general contracting of every kind. We aim to deliver complete solutions that combine quality, accuracy and commitment to specifications and deadlines.

Our work covers residential villas and commercial buildings, reinforced concrete, interior and exterior finishing, infrastructure, boundary walls and tanks, and structural skeleton works.

We apply high safety and quality standards at every stage so that our clients get well-built buildings that combine strength and beauty and last for many years.

Site engineers inspecting a concrete wall

Our vision

Face the future

To be the first choice and leading name in general contracting by delivering projects that embody quality, craftsmanship and innovation, and to be partners in building the Kingdom’s urban future through complete, sustainable engineering solutions that meet our clients’ ambitions and combine beauty, strength and efficiency.

Accuracy

Strict adherence to the engineering drawings in every element, from column positions to tile falls.

Safety

Safety standards applied to everyone on site, at every stage.

On schedule

A clear staged schedule with daily progress tracking.

Quality

Approved materials, and every stage inspected before the next covers it.

Marafi crew fixing reinforcement on stepped slabs

A complete team on site

A professional crew of labourers, technicians, supervisors and engineers ensures the structural integrity and safety of every building, supported by modern equipment for precision and efficiency.

Official registrations

Official registrations

We publish our official registration numbers so you can check them yourself on the government websites.

  • Contractor membership Saudi Contractors Authority No. 2119211993 Valid until Verify number
  • Chamber of Commerce membership Riyadh Chamber No. 1035903 Verify number
  • VAT registration Zakat, Tax and Customs Authority No. 300037786900003 Verify number

Where we work

We are based in Al Aqeeq, Riyadh, and serve districts across the city, including:

  • Al Aqeeq
  • Al Malqa
  • Hittin
  • Al Yasmin
  • An Narjis
  • As Sahafa
  • Ar Rabi
  • An Nakheel
  • Al Ghadir
  • Al Qirawan
  • Al Arid
  • Ar Rimal
  • Al Munsiyah
  • Qurtubah
  • Al Yarmuk
  • An Nada
  • Al Wurud
  • As Sulimaniyah
  • Al Olaya
  • Ar Rawdah
  • Al Malaz
  • Dhahrat Laban

Start your project

Have a plot or a building that needs to be built right?

Tell us the project type and location. A Marafi engineer will arrange a site visit, review your drawings and send a detailed proposal.

Call now WhatsApp