MarafiAl Tamyeez Contracting
Floor levelling and tiling

Services

Floor levelling and tiling

Accurate floor levelling that prepares for flat tiling with no hollows and no lipping between tiles.

We carry out floor levelling with high accuracy to achieve a perfectly flat base for a refined finish, then lay tiles with levelling clips so neighbouring tiles never sit at different heights.

What’s included

  • Survey levels and set the finished floor level
  • Sand-cement or self-levelling screed
  • Tile and porcelain laying with levelling clips
  • Correct falls in bathrooms and roofs
  • Skirting and thresholds
  • Grouting and final clean

Floor Levelling & Tiling

How we deliver it

  1. 01

    Measure levels and screed

  2. 02

    Approve tiles and plan the layout

  3. 03

    Lay with levelling clips

  4. 04

    Grout and protect until handover

From our sites

Frequently asked questions

Floor Levelling & Tiling

What do tile levelling clips do?

They stop height differences (lipping) between tile edges, especially with large formats, so the floor reads perfectly flat.

Why do bathrooms need special falls?

To drain water to the floor drain and stop pooling. We set falls before tiling.

Can new tiles go over old ones?

Sometimes, after checking the old tiles are sound and levels allow, but we usually recommend removal for a reliable result.

Read before you start

Start your project

Have a project in mind?

Tell us the project type and location. A Marafi engineer will arrange a site visit, review your drawings and send a detailed proposal.

Call now WhatsApp